10.
All channels must be kept free of obstructions such as fill ground, fallen
leaves & woody debris,
11.
Vegetated channels shall be constructed free of rocks, tree roots, stumps or
other projections that will impede normal channel flow and/or prevent good
lining to soil contact. The channel shall be initially over-excavated to allow
for the placement of topsoil.
12.
Sediment basins/traps shall be kept free of all trash, concrete wash water and
other debris that pose the potential for clogging the basin/trap outlet
structures and/or pose the potential for pollution to waters of the
Commonwealth.
13.
When sediment has accumulated to the clean out elevation on any stake, all
accumulated sediment shall be removed from the entire trap/basin bottom.
14.
Approval of the use of skimmer(s) does not approve use of any skimmer(s) in
violation of any
15.
Sediment basins must be protected from unauthorized acts of third parties.
16.
Fill material for the embankments shall be free of roots, or other woody
vegetation, organic material, large stones, and other objectionable materials.
The embankment shall be compacted in maximum _______” layered lifts at
_______% density.