Dirt, Gravel and Low Volume Roads Program

The Problem

Dirt, gravel, and low volume roads roads transverse all of our rural landscapes from forests to farmlands.  These roads frequently cut across natural drainage patterns to intercept both overland and sub-surface water flows and convey runoff directly to nearby streams, resulting in sediment pollution, an increase in flood flows, and a decrease in groundwater recharge through infiltration.  The combined “rural storm-water system” is a large, but frequently overlooked cause of stream and watershed degradation and impairment. York County’s Dirt, Gravel, and Low Volume Road Program is available to eligible public road maintenance entities providing both financial and technical assistance.  Better roads, better streams, better communities!

Unpaved Roads and Sediment

Sediment is the largest pollutant by volume to the waters of the commonwealth.  Pennsylvania’s 20,000 miles of publicly owned unpaved roads are a prime example of nonpoint source pollution.  Unpaved roads not only generate sediment, but also act as collectors for runoff and sediment from adjacent land uses.  Traditional practice in road maintenance has been to convey water along roads and deposit it into streams by the quickest means possible.  This practice results in increased flood flows in streams and transports sediment and a host of other pollutants into local waterways.

Low-Volume Roads

Act 89 of 2013 defines low-volume roads as “sealed or paved with an average daily traffic count of 500 vehicles or less.”  The low-volume road portion of the Program focuses on the same environmental improvements as the Dirt and Gravel Road portion, not just paving and repaving roads.

BEFORE

 

AFTER

BEFORE

DURING

AFTER

The Solution

Many of the Environmentally Sensitive Maintenance (ESM) Practices advocated by the Center for Dirt & Gravel (D&G) Road Studies, Penn State University, are designed to “disconnect the rural storm-water system” to reduce sediment pollution, encourage infiltration, and reduce long-term maintenance cost.

ESM Principles:

  • Avoid concentrating drainage.
  • Minimize flow volumes.
  • Reduce effects of concentrated drainage.
  • Prevent surface erosion.
  • Reduce maintenance cost and frequency.

How does it work?

Local, county and state entities that maintain dirt and gravel roads are eligible to receive funding. Entities successful completion of required 2-day Environmentally Sensitive Maintenance (ESM) training, are eligible to apply to the York County Conservation District for maintenance funds to address identified, priority pollution problems using environmentally sound practices. Eligible entities, with assistance of their County Conservation District, submit a 1-page application and work plan to address a specific verified worksite. Environmentally sound maintenance practices and approved products are used to correct pollution problems related to roadway. Grants awarded to successful applicants provide advance payments to aid with project cash flow and complete project work on a timely basis. Paperwork requirements are minimal. Local decision-making based on locally-defined goals is emphasized.

2024 Deadlines for applications & QAB Meeting schedule:

Applications Due:
February 29, 2024
May 23, 2024
August 22, 2024
November 21, 2024

QAB Meeting Dates:

March 28, 2024
June 20, 2024
September 26, 2024
December 19, 2024

All meetings will be held at 2401 Pleasant Valley Road, York, PA 17402 at 1pm.

BEFORE

AFTER

Resources

Training

The Center’s Environmentally Sensitive Maintenance (ESM) Course is an intense two-day classroom session focused on providing the knowledge and tools necessary for road owners to maintain roads in a more cost-efficient and environmentally sensitive manner.  The Center holds approximately 10 ESM courses at locations around Pennsylvania every year.  The course runs from 8 am to 4 pm for two days (doors open at 7 am for registration, continental breakfast and lunch included).  The course is free to municipal, county, and state agencies involved with PA’s Dirt and Gravel Road Program.  All out-of-state and private companies must pay a fee of $395.  This course provides 1.3 Continuing Education Units and 13 Professional Development Hours from the PSU College of Engineering.

Dates for Trainings

Click the above link for more info and all other training locations being offered.

Program Eligibility

Anyone involved in the maintenance of unpaved and/or low volume roads will benefit from the practices taught in this course that are designed to reduce sediment pollution and long-term road maintenance costs. All entities interested in the Dirt & Gravel Roads Program are encouraged to attend.

Potential Grant Applicants: In order to be eligible to apply for Program funds, the person in charge of work plan development and project implementation from the road-owning entity must have attended environmentally sensitive maintenance (ESM) training within the past five (5) calendar years.  This training, and all past 2-day ESM trainings, count as eligibility to apply for BOTH Dirt and Gravel and Low Volume Road funds for a period of five (5) calendar years.

NO MAILED IN REGISTRATIONS! A LIMITED NUMBER OF OPENINGS ARE AVAILABLE: PLEASE REGISTER ON-LINE AS SOON AS POSSIBLE. Registration will be closed 3 days prior to the scheduled program.